Article image
Article image
Article image
Article image

RECONSTRUCTION WORK ON THE C H RISTC H URC H-KAIKOU RA HIGHWAY.—A number of dangepus bends have recently been removed on the main road between Chrisfchurch '.and Kotkoura. po to of ie reconstructed road on the Hundalee-Oaro section, showing the new ■;»; road on right and the old route on le'

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19300904.2.114.1

Bibliographic details

Press, Volume LXVI, Issue 20024, 4 September 1930, Page 13

Word Count
50

RECONSTRUCTION WORK ON THE C H RISTC H URC H-KAIKOU RA HIGHWAY.—A number of dangepus bends have recently been removed on the main road between Chrisfchurch '.and Kotkoura. po to of ie reconstructed road on the Hundalee-Oaro section, showing the new ■;»; road on right and the old route on le' Press, Volume LXVI, Issue 20024, 4 September 1930, Page 13

RECONSTRUCTION WORK ON THE C H RISTC H URC H-KAIKOU RA HIGHWAY.—A number of dangepus bends have recently been removed on the main road between Chrisfchurch '.and Kotkoura. po to of ie reconstructed road on the Hundalee-Oaro section, showing the new ■;»; road on right and the old route on le' Press, Volume LXVI, Issue 20024, 4 September 1930, Page 13