Article image
Article image

The maximum load at the Lake Colerid© power station during the week ended the 23rd inst. was 23,230 k.w. (previous week 22,300 k.w.) and was recorded between 11.30 a.m'. and noon on the 21st irtSt. At the Addington sub-station the maximum was 17.122 k.w. (previous week 16.310 k.w.) and was recorded during: the same halfhour as the power-house maximum. The lake level was at 1671.1 ft, previous week 1671.56 ft, and the averaae inflow from the Harper river was 280 cusecs, previous week 305 cusecs.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19300327.2.56.2

Bibliographic details

Press, Volume LXVI, Issue 19888, 27 March 1930, Page 9

Word Count
85

Page 9 Advertisements Column 2 Press, Volume LXVI, Issue 19888, 27 March 1930, Page 9

Page 9 Advertisements Column 2 Press, Volume LXVI, Issue 19888, 27 March 1930, Page 9