OTIRA LINE.
WASH-OUT REPAIRED. (SPICIAL TO "THE PBE3S.") GRBYMOUTH, April 30. The work of repairing the damage to the railway line between Moana and Kotuku, caused by the wash-out, yvas completed this morning. Normal goods and passenger traffic have resumed. Heavy rains hampered the permanent wav gang; whilst effecting repairs which, under the tiring circumstances, were accomplished in very quick time.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/CHP19260501.2.86
Bibliographic details
Press, Volume LXII, Issue 18680, 1 May 1926, Page 14
Word Count
61OTIRA LINE. Press, Volume LXII, Issue 18680, 1 May 1926, Page 14
Using This Item
Stuff Ltd is the copyright owner for the Press. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Christchurch City Libraries.