Article image
Article image
Article image
Article image
Article image
Article image

MINING.

THE TALISMAN MINE.

(SPECIAL TO "THK PRESS.') KARANGAHAKE, March 7. During the month of February the Talisman Consolidated crushed and treated 3609 tons of ore for n yield of bu'iion valued at £16,153 13s UVI. The costs ior the past month totalled 37s od. made up as follows : — Mine development 8s 3d. mining 12s l)d, milling 14. 2d, general expenses 2s 3d. The followi-is. cable message has been despatched to London :--"Xo. 13 Level X'orth—Progress lift, width of reef 54in. values low. No. 13 Level South—Progress 68ft, width of reef 2lin. values low. Commenced sinking No. 15 wirvze al a point 745 ft south. Progress 15ft: reef wider than winze, sssoy value £12."

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19110308.2.53.16

Bibliographic details

Press, Volume LXVII, Issue 13986, 8 March 1911, Page 10

Word Count
114

MINING. THE TALISMAN MINE. Press, Volume LXVII, Issue 13986, 8 March 1911, Page 10

MINING. THE TALISMAN MINE. Press, Volume LXVII, Issue 13986, 8 March 1911, Page 10