Article image
Article image
Article image
Article image

HUGE GRAVING DOCK

Liner Queen Mary Could Be Accommodated SYDNEY'S £9,000,000 PROJECT Rec. 2 p.mi SYDNEY, this day. The new Sydney graving dock, which will be opened next week by the Duchess of Gloucester,, has already cost more than £8,000,000; and it is estimated that the final cost will be £9,000,000. The original estimated cost was only £2,997,000. - The Minister, of .Works, Mr. Lazzarini, staled that this prepared in 1939. Later alterations and addition's involved a considerable enlargement of the dock. These alterations would increase the cost to £4147,000 on the basis of 1939 figures, but investigations had revealed that the original estimate of £2 997,000 was too low, even on 1939 figures, and substantial increases in the cost of materials, and also labour costs, had meant large increases in the total cost. The dock has already been in yse and is sufficiently large to accommodate the super-liner Queen Mary comfortably.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19450316.2.69

Bibliographic details

Auckland Star, Volume LXXVI, Issue 64, 16 March 1945, Page 5

Word Count
151

HUGE GRAVING DOCK Auckland Star, Volume LXXVI, Issue 64, 16 March 1945, Page 5

HUGE GRAVING DOCK Auckland Star, Volume LXXVI, Issue 64, 16 March 1945, Page 5