MINING NEWS.
MOUNT MORGAN OUTPUT. Mount Morgan (Queensland) production for the four weeks ended November 10 was as follows:—Ore mined. 57.028 tons; ore treated, sulphide 28.550 tons, oxidised 26.867 tons: estimated production, gold 51'lOozs. copper 179 tons. RETURNS OF COMPANIES. Matakl Junction (Murchlson).—Return for the week ended November 11 was 750z of smelted gold for 124 hours and 17,000 yards dredged. Worksop Extended (Reefton).—l3oz for ISO hours and 1)000 yards dredged. Nemona (Reefton).—OOoz for 128 hours and tU.700 yards dredged. Mossy Creek t ßeefton).—33 >z 6dwt for 130 hours and 8171 yards dredged. Talisman Dublin (Karangaliakei.—Fortysix tons of ore were treated at the Golden Dawn batt»ry for «n approximate realisation of f
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19371115.2.36
Bibliographic details
Auckland Star, Volume LXVIII, Issue 271, 15 November 1937, Page 4
Word Count
112MINING NEWS. Auckland Star, Volume LXVIII, Issue 271, 15 November 1937, Page 4
Using This Item
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.