NEARINC COMPLETION.—Work on the last span of die nero traffic bridge at Fairfield, Hamilton, 'a almost finished, and it will not be long before Oie structure is open to traffic. It is then proposed to close for repairs the old bridge at the opposite end of the town.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19370127.2.91.8
Bibliographic details
Auckland Star, Volume LXVIII, Issue 22, 27 January 1937, Page 9
Word Count
48NEARINC COMPLETION.—Work on the last span of die nero traffic bridge at Fairfield, Hamilton, 'a almost finished, and it will not be long before Oie structure is open to traffic. It is then proposed to close for repairs the old bridge at the opposite end of the town. Auckland Star, Volume LXVIII, Issue 22, 27 January 1937, Page 9
Using This Item
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.