Article image
Article image
Article image
Article image

NEARINC COMPLETION.—Work on the last span of die nero traffic bridge at Fairfield, Hamilton, 'a almost finished, and it will not be long before Oie structure is open to traffic. It is then proposed to close for repairs the old bridge at the opposite end of the town.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19370127.2.91.8

Bibliographic details

Auckland Star, Volume LXVIII, Issue 22, 27 January 1937, Page 9

Word Count
48

NEARINC COMPLETION.—Work on the last span of die nero traffic bridge at Fairfield, Hamilton, 'a almost finished, and it will not be long before Oie structure is open to traffic. It is then proposed to close for repairs the old bridge at the opposite end of the town. Auckland Star, Volume LXVIII, Issue 22, 27 January 1937, Page 9

NEARINC COMPLETION.—Work on the last span of die nero traffic bridge at Fairfield, Hamilton, 'a almost finished, and it will not be long before Oie structure is open to traffic. It is then proposed to close for repairs the old bridge at the opposite end of the town. Auckland Star, Volume LXVIII, Issue 22, 27 January 1937, Page 9