Article image
Article image

Good progress is being made with the construction of the deviation leading to the site of the new overbridge which will eliminate the level crossing at Tarukenga, on the Mamaku Hill, about ten miles from Rotorua. The contractor has also started the construction of the bridge.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19361117.2.21

Bibliographic details

Auckland Star, Volume LXVII, Issue 273, 17 November 1936, Page 3

Word Count
46

Untitled Auckland Star, Volume LXVII, Issue 273, 17 November 1936, Page 3

Untitled Auckland Star, Volume LXVII, Issue 273, 17 November 1936, Page 3