Article image
Article image
Article image
Article image

MINING NEWS.

MINE MANAGERS' REPORTS. Mataki (Murchison).— We wore enabled (a move into the outside cut on Monday tor the first time since the flood, and the day was spent in removing drift and timber from this face. There was no wash-up as usual on Friday owing to pressure of work caused by tlie flood. YIELDS OF COMPANIES. Lawson's Flat (West Coast).'—oloz lodwt retorted gold for three weeks ended Sands. —450z for 39 shifts of ei^\rgo°Dredse?^42o! s for 9000 yards and Dubbo. —-38 7-10 tons of ore were treated at the Golden Dawn battery for an approximate realisation of fc47o. Brian Boru. —As a result of trial runs since the completion of repairs to the Brian Boru dredge, looz 17dwt logr of retorted gold lias been obtained from approximately 8000 yards treated.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19361024.2.17.7

Bibliographic details

Auckland Star, Volume LXVII, Issue 253, 24 October 1936, Page 4

Word Count
132

MINING NEWS. Auckland Star, Volume LXVII, Issue 253, 24 October 1936, Page 4

MINING NEWS. Auckland Star, Volume LXVII, Issue 253, 24 October 1936, Page 4