Article image
Article image
Article image
Article image

RIDGEWAY ROAD.

START OF THE' WORK. FIFTY MEN ENGAGED! A start was made this morning by 50 men at Exhibition Drive on the construction of the Waitakere ridge scenic, road. The men were selected by the Government placement officer, and as the work develops others will be put' on until about 200 are engaged. The men will go to and from their homes to the job. The intention is to push the work on as rapidly as possible, and in addition to existing roads which will be used, thera will be a large amount of new construction at various point's along the proposed route.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19360928.2.103

Bibliographic details

Auckland Star, Volume LXVII, Issue 230, 28 September 1936, Page 9

Word Count
104

RIDGEWAY ROAD. Auckland Star, Volume LXVII, Issue 230, 28 September 1936, Page 9

RIDGEWAY ROAD. Auckland Star, Volume LXVII, Issue 230, 28 September 1936, Page 9