Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

HAMILTON FOOTBRIDGE.

(Fram Our Own Correspondent.)

HAMILTON, Friday.

The construction of the new footway alongside the Hamilton railway bridge has been completed. The structure is a great improvement on the old 4ft Gin wooden bridge which it replaced. Made of welded steel, the new bridge, was designed and fabricated by the Hamilton "Borough Council staff, and was placed in position by the Railway Department. It is 500 ft long and Oft wide, and was made in 34 sections.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19360613.2.141

Bibliographic details

Auckland Star, Volume LXVII, Issue 139, 13 June 1936, Page 13

Word Count
78

HAMILTON FOOTBRIDGE. Auckland Star, Volume LXVII, Issue 139, 13 June 1936, Page 13

HAMILTON FOOTBRIDGE. Auckland Star, Volume LXVII, Issue 139, 13 June 1936, Page 13