EXCAVATIONS AT MOUNT HOBSON. —The construction of a new reservoir at Mou ntHob sonisbemgcamed seen are the original reservoirs constructed at work on the Bp of the crater for the The present rese rvoir, with a capacity of 1,250,000 many years ago by the Remuera Road Board. These each fa*d a capacity or ou, g
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19340126.2.41.1
Bibliographic details
Auckland Star, Volume LXV, Issue 22, 26 January 1934, Page 5
Word Count
55EXCAVATIONS AT MOUNT HOBSON.—The construction of a new reservoir at MountHobsonisbemgcamed seen are the original reservoirs constructed at work on the Bp of the crater for the Thepresent reservoir, with a capacity of 1,250,000 many years ago by the Remuera Road Board. These each fa*d a capacity or ou, g Auckland Star, Volume LXV, Issue 22, 26 January 1934, Page 5
Using This Item
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.