Article image
Article image
Article image
Article image

EXCAVATIONS AT MOUNT HOBSON. —The construction of a new reservoir at Mou ntHob sonisbemgcamed seen are the original reservoirs constructed at work on the Bp of the crater for the The present rese rvoir, with a capacity of 1,250,000 many years ago by the Remuera Road Board. These each fa*d a capacity or ou, g

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19340126.2.41.1

Bibliographic details

Auckland Star, Volume LXV, Issue 22, 26 January 1934, Page 5

Word Count
55

EXCAVATIONS AT MOUNT HOBSON.—The construction of a new reservoir at MountHobsonisbemgcamed seen are the original reservoirs constructed at work on the Bp of the crater for the Thepresent reservoir, with a capacity of 1,250,000 many years ago by the Remuera Road Board. These each fa*d a capacity or ou, g Auckland Star, Volume LXV, Issue 22, 26 January 1934, Page 5

EXCAVATIONS AT MOUNT HOBSON.—The construction of a new reservoir at MountHobsonisbemgcamed seen are the original reservoirs constructed at work on the Bp of the crater for the Thepresent reservoir, with a capacity of 1,250,000 many years ago by the Remuera Road Board. These each fa*d a capacity or ou, g Auckland Star, Volume LXV, Issue 22, 26 January 1934, Page 5