Article image
Article image
Article image
Article image
Article image
Article image

WATERLOO BRIDGE.

RECONDITIONING SCHEME.

RUGBY, January 25. A letter from the Ministry of Transport was read at a meeting of the London County Council yesterday which stated that the Government had reached a conclusion to proceed to recondition Waterloo Bridge at an estimated cost of £685,000. A grant of 00 per cent of the cost would bo made by the Ministry. It was suggested that the question of corbelling should be referred to the Fine Arts Committee.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19330126.2.80

Bibliographic details

Auckland Star, Volume LXIV, Issue 21, 26 January 1933, Page 7

Word Count
77

WATERLOO BRIDGE. Auckland Star, Volume LXIV, Issue 21, 26 January 1933, Page 7

WATERLOO BRIDGE. Auckland Star, Volume LXIV, Issue 21, 26 January 1933, Page 7