Article image
Article image
Article image
Article image

POINT ERIN CAUSEWAY. —Since the work of building a road from the foot of Curran Street round the foot of the cliff towards Point Erin was started at the beginning of August, considerable progress has been made. The picture shows the portion of the work under the control of the City Council, about 500 feet. A large portion of the.cliff has had.to be cut away to form the road.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19311015.2.97.6

Bibliographic details

Auckland Star, Volume LXII, Issue 243, 15 October 1931, Page 9

Word Count
69

POINT ERIN CAUSEWAY.—Since the work of building a road from the foot of Curran Street round the foot of the cliff towards Point Erin was started at the beginning of August, considerable progress has been made. The picture shows the portion of the work under the control of the City Council, about 500 feet. A large portion of the.cliff has had.to be cut away to form the road. Auckland Star, Volume LXII, Issue 243, 15 October 1931, Page 9

POINT ERIN CAUSEWAY.—Since the work of building a road from the foot of Curran Street round the foot of the cliff towards Point Erin was started at the beginning of August, considerable progress has been made. The picture shows the portion of the work under the control of the City Council, about 500 feet. A large portion of the.cliff has had.to be cut away to form the road. Auckland Star, Volume LXII, Issue 243, 15 October 1931, Page 9