Article image
Article image
Article image
Article image

IMPORTANT WORK ON THE WELLINGTON END OF THE MAIN TRUNK LINE.—A scene along the Wellington waterfront, showing the Tawa Flat deviation crossing the Hutt Road to the embankment. The deviation will eliminate the heavy grades and circuitous route on the Main Trunk line entering Wellington.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19300926.2.77.6

Bibliographic details

Auckland Star, Volume LXI, Issue 228, 26 September 1930, Page 8

Word Count
45

IMPORTANT WORK ON THE WELLINGTON END OF THE MAIN TRUNK LINE.—A scene along the Wellington waterfront, showing the Tawa Flat deviation crossing the Hutt Road to the embankment. The deviation will eliminate the heavy grades and circuitous route on the Main Trunk line entering Wellington. Auckland Star, Volume LXI, Issue 228, 26 September 1930, Page 8

IMPORTANT WORK ON THE WELLINGTON END OF THE MAIN TRUNK LINE.—A scene along the Wellington waterfront, showing the Tawa Flat deviation crossing the Hutt Road to the embankment. The deviation will eliminate the heavy grades and circuitous route on the Main Trunk line entering Wellington. Auckland Star, Volume LXI, Issue 228, 26 September 1930, Page 8