JNORTHCOTE MAIN STREET.
1 SECTION OF CONCRETE OPEN. ' The first section of concrete paving. 1 between Clan-nce Street and Rodncr ■ Street, of the main street at Northcote. ' was opened for traffic to-day. The con- ! Crete occupies a width of IS feet in the ' centre of the roadway, and the ! ' •shoulder-" wi!l be constructed forthI with on both sides. This will relieve the heavy traffic through Clarence Street. , ; which may now be diverted to Rodney • • Street. Tho northern portion of the | ! concrete paving, from Rodney Road to the War Memorial, will be ready for I traffic in about a week.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19270601.2.132
Bibliographic details
Auckland Star, Volume LVIII, Issue 127, 1 June 1927, Page 10
Word Count
99JNORTHCOTE MAIN STREET. Auckland Star, Volume LVIII, Issue 127, 1 June 1927, Page 10
Using This Item
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.