Article image
Article image
Article image
Article image

JNORTHCOTE MAIN STREET.

1 SECTION OF CONCRETE OPEN. ' The first section of concrete paving. 1 between Clan-nce Street and Rodncr ■ Street, of the main street at Northcote. ' was opened for traffic to-day. The con- ! Crete occupies a width of IS feet in the ' centre of the roadway, and the ! ' •shoulder-" wi!l be constructed forthI with on both sides. This will relieve the heavy traffic through Clarence Street. , ; which may now be diverted to Rodney • • Street. Tho northern portion of the | ! concrete paving, from Rodney Road to the War Memorial, will be ready for I traffic in about a week.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19270601.2.132

Bibliographic details

Auckland Star, Volume LVIII, Issue 127, 1 June 1927, Page 10

Word Count
99

JNORTHCOTE MAIN STREET. Auckland Star, Volume LVIII, Issue 127, 1 June 1927, Page 10

JNORTHCOTE MAIN STREET. Auckland Star, Volume LVIII, Issue 127, 1 June 1927, Page 10