MINING NEWS.
MINE MANAGERS' REPORTS.
Majestic.—The mine manager reports Unit .luring 11..' fortnight the contractors buve extended the south drive on tbe Muralolu reef ain't, milking a total distance of. (J-I.sft. Tbe reef was'exposed fur the full width or tlie drive, and showed mineralised vugs In the centre of tbe reel. The lust lew rounds indicated that tbe reef i-s bearing t„ the hanglngwali. aud there is now about -ft ur country rock showing >,v the font wall. Mnuiultaiari.- The ...unager reports that dining the week the following work has been ill progress: Cambria Section: Last crosscut advanced oft. total Libit. Tbe country is of a nice mild description. West crosscut advanced Sft. total 7."ft. The country is still of a splendid character, but in, quartz bus yet been met with in either crosscut. No. 0 leader: The drive hillwards was advanced ."ft. The lender is about Oin wide, carrying iron pyrites and antimony. lie..own. —The manager reports that fur the past week men have been employed building hopper nt the buttery, and also building dam. All outside work will be completed ne.vt week aud the first ,-r.ishing will go through the Ross Ore Mill on June 9.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19250608.2.27
Bibliographic details
Auckland Star, Volume LVI, Issue 133, 8 June 1925, Page 5
Word Count
198MINING NEWS. Auckland Star, Volume LVI, Issue 133, 8 June 1925, Page 5
Using This Item
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.