BROKEN HILL MINE FIRE. ANOTHER LEVEL ABLAZE. SYDNEY, August I. The management of the Central mine, Broken Hill, has now found a fire in the 1200 ft level. Operations are being started on Stephen's Creek reservoir in orde,r to keep up with the demands for water supply.—(A. and'N.Z. Cable.)
ANOTHER LEVEL ABLAZE. SYDNEY, August I. The management of the Central mine, Broken Hill, has now found a fire in the 1200 ft level. Operations are being started on Stephen's Creek reservoir in order to keep up with the demands for water supply.—(A. and'N.2. Cable.)
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19230802.2.84
Bibliographic details
Auckland Star, Volume LIV, Issue 183, 2 August 1923, Page 5
Word Count
94BROKEN HILL MINE FIRE. ANOTHER LEVEL ABLAZE. SYDNEY, August I. The management of the Central mine, Broken Hill, has now found a fire in the 1200 ft level. Operations are being started on Stephen's Creek reservoir in orde,r to keep up with the demands for water supply.—(A. and'N.Z. Cable.) Auckland Star, Volume LIV, Issue 183, 2 August 1923, Page 5
Using This Item
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.