Article image
Article image
Article image
Article image

NEW HOSPITAL BLOCK.

TO COST £1144)00. BIG WELLINGTON SCHEME. (Bj- Teleprapb.—Press AaocUtfen} ' WELLINGTON", this day. The Wellington Hospital Board i» w «. sidering a proposal to erect a nev Woft at an estimated cost of £118,000 % building alone, as part of a Iwpr scheme for remodelling the whole ertib. lishment. The existing acconnnoditina is inadequate, and it is stated that tie old building was constructed on a wrest plan, the wards mostly being tqnjlie from the sun instead of towtrdj it. As the cost would be too great t» abandon the present building, th* «1t course to adopt is to remodel tie eM part as far as possible and erect l 4& tions on more modern pU«e.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19230227.2.37

Bibliographic details

Auckland Star, Volume LIV, Issue 49, 27 February 1923, Page 4

Word Count
116

NEW HOSPITAL BLOCK. Auckland Star, Volume LIV, Issue 49, 27 February 1923, Page 4

NEW HOSPITAL BLOCK. Auckland Star, Volume LIV, Issue 49, 27 February 1923, Page 4