Article image
Article image
Article image
Article image

OKAHUKURA TUNNEL.

WORK TO BE PUSHED ON. (By-Telegraph.—Own Correspondent.) TE EDITI, this day. ' The big tunnel work at Okahukura, which was closed down a. month ago, is to be restarted next week, the bondsmen laving been called upon to do so. -One of the .bondsmen has .written to Mr Jen-., nings, M-'P., stating that Mr Dillon, contractor, of Wellington, is to h*ve full charge, and the contract will be puehed lon at high speed.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19150320.2.21

Bibliographic details

Auckland Star, Volume XLVI, Issue 68, 20 March 1915, Page 6

Word Count
74

OKAHUKURA TUNNEL. Auckland Star, Volume XLVI, Issue 68, 20 March 1915, Page 6

OKAHUKURA TUNNEL. Auckland Star, Volume XLVI, Issue 68, 20 March 1915, Page 6