Article image
Article image
Article image
Article image

NEW RAILWAYS.

WAIDKU AND WHANGS When the Prime Minister again, next month, one of perform is the sod of the Waiiiku branch survey work of which was fll "s'°iT t year. A vote of £10,000 *«*^i J krUaroent for starting the aeWl etrociion work tot. ee»on,jw;»j,, MHnfctCT of Public Work* lassurance that • the line wffl , * along as rapi«y M *he «**£*& allow. The whole length pleted w2l be «hont *"*£**"'s route going through JWeggfrjtapping a large *nd f « a S not at present served Anotter Auckland railway wWen started -upon this year fa th« ■wfll link mp the present J 4 ** Whangarei section with the Trunk system. The rwite ■ this piece of line, which hu W£ actively been advocated by «»• f. -fortodfetricVMr.xato^ way of Mangipei "^A-S^i , VaOey, eceeitating abof f>J& construction. A sum f>[ *}?<%s. placed <m the last Estimates for .*&*■ aerations on this sert|on of raUW 1 . - '" 1

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19140119.2.22

Bibliographic details

Auckland Star, Volume XLV, Issue 16, 19 January 1914, Page 4

Word Count
148

NEW RAILWAYS. Auckland Star, Volume XLV, Issue 16, 19 January 1914, Page 4

NEW RAILWAYS. Auckland Star, Volume XLV, Issue 16, 19 January 1914, Page 4