NEW RAILWAYS.
WAIDKU AND WHANGS When the Prime Minister again, next month, one of perform is the sod of the Waiiiku branch survey work of which was fll "s'°iT t year. A vote of £10,000 *«*^i J krUaroent for starting the aeWl etrociion work tot. ee»on,jw;»j,, MHnfctCT of Public Work* lassurance that • the line wffl , * along as rapi«y M *he «**£*& allow. The whole length pleted w2l be «hont *"*£**"'s route going through JWeggfrjtapping a large *nd f « a S not at present served Anotter Auckland railway wWen started -upon this year fa th« ■wfll link mp the present J 4 ** Whangarei section with the Trunk system. The rwite ■ this piece of line, which hu W£ actively been advocated by «»• f. -fortodfetricVMr.xato^ way of Mangipei "^A-S^i , VaOey, eceeitating abof f>J& construction. A sum f>[ *}?<%s. placed <m the last Estimates for .*&*■ aerations on this sert|on of raUW 1 . - '" 1
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19140119.2.22
Bibliographic details
Auckland Star, Volume XLV, Issue 16, 19 January 1914, Page 4
Word Count
148NEW RAILWAYS. Auckland Star, Volume XLV, Issue 16, 19 January 1914, Page 4
Using This Item
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.