Article image
Article image
Article image
Article image

ENGINES FOR MAIN TRUNK.

s (By Telegraph.—Press Association.") CHRISTCHURCH, this day. At the Addington railway workshops eight large compound engines are under construction for use on the Raurimu spiral of the North Island Main Trunk railway. The boilers each weigh 16 tons 10 cwts empty, and are the largest locomotive boilers in the Dominion. It is expected that two of these engines will be ready in two or three months from the present.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS19080930.2.15

Bibliographic details

Auckland Star, Volume XXXIX, Issue 234, 30 September 1908, Page 3

Word Count
73

ENGINES FOR MAIN TRUNK. Auckland Star, Volume XXXIX, Issue 234, 30 September 1908, Page 3

ENGINES FOR MAIN TRUNK. Auckland Star, Volume XXXIX, Issue 234, 30 September 1908, Page 3