Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

THANKS NOTES.

(BT TELEORAPH—OWN CORRESPONDENT.)

Thames, this doy. New Amjubnu.— Now thab tho exact position of the 70tb level and Dixon'a reet has been ascertained, a commencement will be made to enlarge the chamber and crosscut, preparatoiy to beginning extensive developmentß on thereof recently intersected, which looka promising. Thames Hauraki — Work on thia Company's ahafc is progressing rapidly ; 14fb were cub down during the past week, mailing a total depth "reached from the commencement of 208fb. The new shaft in the Deep Sinker section of the Company's property is well under way. . Golden Point.—A splendid channel of country is being met with in the footwall of the reef recently intersected. A distance of lift has been driven past that

point. Sheridan.—No change has taken place ia the country *b the low level, but notWithstanding this, fair progress ia being made.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS18960706.2.15.2

Bibliographic details

Auckland Star, Volume XXVII, Issue 157, 6 July 1896, Page 2

Word Count
140

THANKS NOTES. Auckland Star, Volume XXVII, Issue 157, 6 July 1896, Page 2

THANKS NOTES. Auckland Star, Volume XXVII, Issue 157, 6 July 1896, Page 2