Article image
Article image
Article image
Article image

SAN FRANCISCO MAIL NEWS.

THK CHANNEL TUiSNEL; The Channel Tunnel is making progtced. On the French tide the work has reached a distance of 1,800 metres, while on the Ene. lish side 1,600 metres have been completed. This makes in all 3,400 metres, or consider, ably more than one-tenth of the entire c*" tent of piercing to be accomplished, the tunnel being rather more than 29 kilometre! long, supposing that it ia decided to jb on with the work; and that the needed 39 mil. lions can be railed, the tiinacl might Decoiti. pleted in a few years. The original culcnla". tioa was that it would require two yean to pierce a way of 7 or 9in. diameter from one side of the Channel to the other, a machine being worked from each side, bow that the experiment is proceeding in good ear. nest there seems every reason to think the task might be accomplished within some* thing leas than that period, from the pro. sent date. If so, another four years wonld probably be required to complete the en* tire work and reader it fit for traffic,

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AS18811215.2.21

Bibliographic details

Auckland Star, Volume XII, Issue 3544, 15 December 1881, Page 2

Word Count
188

SAN FRANCISCO MAIL NEWS. Auckland Star, Volume XII, Issue 3544, 15 December 1881, Page 2

SAN FRANCISCO MAIL NEWS. Auckland Star, Volume XII, Issue 3544, 15 December 1881, Page 2