Article image
Article image
Article image
Article image
Article image
Article image

BY SUBMARINE TO THE NORTH POLE.— At top, the Nautilus, in which Sir Hubert Wilkins Is attempting to reach the North Pole. Below, members of the crew photographed on the deck of the Nautilus. Sir Hubert, wearing a cap, is crouched on the deck. The Nautilus has arrived at Tromsoe.

REPLACING THE DESTROYED BRIDGE AT WAIROA. — For five months all vehicular traffic over the Wairoa River has been conveyed by punt, for such damage was done to the structure by the earthquake in February that repairs were out of the question. A start has now been made with the driving of piles for a new ferro-concrete bridge across the river. The old bridge and punt ferry are shown.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/WT19310811.2.19.3

Bibliographic details

Waikato Times, Volume 110, Issue 18404, 11 August 1931, Page 3

Word Count
118

BY SUBMARINE TO THE NORTH POLE.—At top, the Nautilus, in which Sir Hubert Wilkins Is attempting to reach the North Pole. Below, members of the crew photographed on the deck of the Nautilus. Sir Hubert, wearing a cap, is crouched on the deck. The Nautilus has arrived at Tromsoe. REPLACING THE DESTROYED BRIDGE AT WAIROA.—For five months all vehicular traffic over the Wairoa River has been conveyed by punt, for such damage was done to the structure by the earthquake in February that repairs were out of the question. A start has now been made with the driving of piles for a new ferro-concrete bridge across the river. The old bridge and punt ferry are shown. Waikato Times, Volume 110, Issue 18404, 11 August 1931, Page 3

BY SUBMARINE TO THE NORTH POLE.—At top, the Nautilus, in which Sir Hubert Wilkins Is attempting to reach the North Pole. Below, members of the crew photographed on the deck of the Nautilus. Sir Hubert, wearing a cap, is crouched on the deck. The Nautilus has arrived at Tromsoe. REPLACING THE DESTROYED BRIDGE AT WAIROA.—For five months all vehicular traffic over the Wairoa River has been conveyed by punt, for such damage was done to the structure by the earthquake in February that repairs were out of the question. A start has now been made with the driving of piles for a new ferro-concrete bridge across the river. The old bridge and punt ferry are shown. Waikato Times, Volume 110, Issue 18404, 11 August 1931, Page 3