Article image
Article image
Article image
Article image

GREAT SOUTH ROAD

PLANS NEARLY READY. The engineer stated at Monday’s meeting of the Waipa County Council that he hopes to complete by the end of the month, or early in January, the plans and specifications for reconstructing and surfacing with bitumen the whole length of Great South Road within the county, a length ”*of 32 miles. It had been a very difficult and intricate task, and the full cost of the road, including • a new bridge over the Puniu Stream south of Kihikihi, would be in the vicinity of £130,000. Mr Civil added that he purposed working right through the holiday season in an effort to complete the specifications for submission to the Main Highways Board.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/WAIPO19311222.2.19

Bibliographic details

Waipa Post, Volume 43, Issue 3391, 22 December 1931, Page 4

Word Count
117

GREAT SOUTH ROAD Waipa Post, Volume 43, Issue 3391, 22 December 1931, Page 4

GREAT SOUTH ROAD Waipa Post, Volume 43, Issue 3391, 22 December 1931, Page 4