MINING NEWS.
(BT TBLSGRAPH-OWN CORRMPOWDBin 1.)
Auckland, June 7. WAIHI-BJLVEBTON.
The new turbine which in to be erected at the Waihi-Silverton battery was shipped to Paeroa to day.
THAMES HAVPAKI. TLe discharging of the machinery from the joow Bavoc for the rhames H»ur»ki Conapaoy U crs*tinf » good *•! of utWml. Both jmimUj *«d
to-day, Shortlttud wb«rt w»m crowded with a number of p«ople watching the proceedings, and the waggon, * and teams there loading up prfmenfced qu.it* ' • ousy appearance, jhe machinery is being oouvejfd to the CompmiT's works by Mr P. Maxwell. The Cgit part of it, bo*ever has now been reTV^V* nd the work dkclwrging should be completed to-morrow. N.Z. JUBILEE GOLD MINE. _Thi. company started to cm* on ™»y- r 5 »• only, of ooiim, a trial of the engme and plact, and for the moment fire Btampen only are at work. The Jubilee boaat/quit. . large staff, an aswyer and an engineer having recently been added. ,
ALPHA.
The Waitekauri Age states that the Aipu road is now completed with the exception of the upper cutting.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/THS18980607.2.20
Bibliographic details
Thames Star, Volume XXX, Issue 9088, 7 June 1898, Page 2
Word Count
174MINING NEWS. Thames Star, Volume XXX, Issue 9088, 7 June 1898, Page 2
Using This Item
No known copyright (New Zealand)
To the best of the National Library of New Zealand’s knowledge, under New Zealand law, there is no copyright in this item in New Zealand.
You can copy this item, share it, and post it on a blog or website. It can be modified, remixed and built upon. It can be used commercially. If reproducing this item, it is helpful to include the source.
For further information please refer to the Copyright guide.