Article image
Article image
Article image
Article image

MAIN HIGHWAYS

IN WAI.PA COUNTY. Reporting to to-day's meeting of the Waipa County Council, the engineer (Mr J. W. Civil) made the following reference to general construction on main highways: Frankton ■ Pirongia main highway: Contract No. 357: Two miles 45 chains of stabilised top course have been laid down, work in progress, and li miles of sealing have been completed. Kihikihi - Arapuni main highway, contracts Nos. 348 and 355: Two miles 48 chains have been sealed, which completes both contracts from the junetjon of the Great South Road to 30 chains past Parawera Junction. Estimates for main highways construction and maintenance for year 1939-40 have been prepared and forwarded to the resident engineer, also estimates for Public Works grants Te Awamutu - Pirongia main highway: A start has been made on engineering survey of this highway foi next season’s programme.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/TAWC19390524.2.36

Bibliographic details

Te Awamutu Courier, Volume 58, Issue 4188, 24 May 1939, Page 7

Word Count
139

MAIN HIGHWAYS Te Awamutu Courier, Volume 58, Issue 4188, 24 May 1939, Page 7

MAIN HIGHWAYS Te Awamutu Courier, Volume 58, Issue 4188, 24 May 1939, Page 7