Article image
Article image
Article image
Article image

NEW BRIDGES AT PRESENT UNDER CONSTRUCTION IN THE AUCKLAND PROVINCIAL DISTRICT: TRAFFIC BRIDGE AT HAMILTON AND A STRUCTURE NEAR TE AWAMUTU Left: A view showing the progress which has been made with the new bridge at Fairfield, near the northern boundary of the Hamilton Borough. One of the three bowstring arch spans is completed and the second is rapidly taking shape. Right: A bridge of the cantilever type being constructed across the Puniu River, near Te Awamutu. It will be a link on a new deviation which will eliminate a dangerous section of the main Auckland-Wellington highway.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19360704.2.28.5

Bibliographic details

New Zealand Herald, New Zealand Herald, Volume LXXIII, Issue 22462, 4 July 1936

Word Count
97

NEW BRIDGES AT PRESENT UNDER CONSTRUCTION IN THE AUCKLAND PROVINCIAL DISTRICT: TRAFFIC BRIDGE AT HAMILTON AND A STRUCTURE NEAR TE AWAMUTU Left: A view showing the progress which has been made with the new bridge at Fairfield, near the northern boundary of the Hamilton Borough. One of the three bowstring arch spans is completed and the second is rapidly taking shape. Right: A bridge of the cantilever type being constructed across the Puniu River, near Te Awamutu. It will be a link on a new deviation which will eliminate a dangerous section of the main Auckland-Wellington highway. New Zealand Herald, Volume LXXIII, Issue 22462, 4 July 1936

Working