REPAIRS TO STEAMER
PROGRESS ON RANGATIRA Repairs to the hull of the ferry steamer Rangatira, which struck a rock off Wellington, are now practically completed, and it is anticipated that the vessel will come off the floating dock this week. After she comes off the dock the Rangatira will be laid up for a month or six weeks to enable engineroom and other internal repairs to bo completed before she re-enters the Wellington-Lyttelton service.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NZH19360525.2.95
Bibliographic details
New Zealand Herald, Volume LXXIII, Issue 22427, 25 May 1936, Page 12
Word Count
74REPAIRS TO STEAMER New Zealand Herald, Volume LXXIII, Issue 22427, 25 May 1936, Page 12
Using This Item
NZME is the copyright owner for the New Zealand Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence . This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries and NZME.