Article image
Article image
Article image
Article image
This article displays in one automatically-generated column. View the full page to see article in its original form.

HOTEL ALTERATIONS

WORK AT TITIRANGI Extensive alterations and additions, are at present being ' made to the Hotel Titirangi. It is hoped that the work, which involves nearly £3000,. will be completed by Christmas. The additions comprise eight bedthroe bathrooms and a billiard room. A new i. lounge is being constructed on the roof and the tearoom and dining room are being enlarged. A shop ip the building is being converted into a dining room for private parties. In the grounds two tennis courts and a putting green are being constructed The work is being carried out by Mr. p.; W. Peate for the present lessees, R. Nicolas and Company. Mr. Jj. S. Piper is tho architect.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19351127.2.158

Bibliographic details

HOTEL ALTERATIONS, New Zealand Herald, Volume LXXII, Issue 22277, 27 November 1935

Word Count
116

HOTEL ALTERATIONS New Zealand Herald, Volume LXXII, Issue 22277, 27 November 1935

Working