NEW CONCRETE BRIDGE FORMING PART OF AN IMPROVEMENT SCHEME ON A SECTION OF THE GREAT SOUTH ROAD A view of the new bridge crossing the Maketu Stream, just south of Drury. This bridge was one of the major works, of the contract for concreting the Great South Road between Papakura and Runciman. The section between Papakura and Drury is to be opened to-day.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NZH19340818.2.25.2
Bibliographic details
New Zealand Herald, Volume LXXI, Issue 21882, 18 August 1934, Page 8
Word Count
63NEW CONCRETE BRIDGE FORMING PART OF AN IMPROVEMENT SCHEME ON A SECTION OF THE GREAT SOUTH ROAD A view of the new bridge crossing the Maketu Stream, just south of Drury. This bridge was one of the major works, of the contract for concreting the Great South Road between Papakura and Runciman. The section between Papakura and Drury is to be opened to-day. New Zealand Herald, Volume LXXI, Issue 21882, 18 August 1934, Page 8
Using This Item
NZME is the copyright owner for the New Zealand Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence . This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries and NZME.