MINING NEWS.
' REPORTS OF MANAGERS. Waionio Sulphide Corporation.-«Zeeban section: No. 2 winze, at No. 3 level, is down 07ft'.. on No. 1 reef, the width being 3fi. and value £5 13s 9d. Stopiug is in progress between Nos. 2 and 3 levels on the Zeohan and No 1 reefs the average grado' noxr being £2 15s per ton gold and silver.- The company has acquired tho Monowoi claims and operations to make the main level# accessible have been commenced. The main reef in this sectior ranges in size from 25f;. to 35ft., and contains a large tonnage of payable ore of a complex nature suitable for treatment by the oil flotation process. During the period ending July 24 gold and silver concentrates totalling £I9OO weia Obtained for a run of 31 days, with the full capacity of the mill, *
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NZH19300813.2.22
Bibliographic details
New Zealand Herald, Volume LXVII, Issue 20641, 13 August 1930, Page 7
Word Count
139MINING NEWS. New Zealand Herald, Volume LXVII, Issue 20641, 13 August 1930, Page 7
Using This Item
NZME is the copyright owner for the New Zealand Herald. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence . This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries and NZME.