Article image
Article image
Article image
Article image
This article displays in one automatically-generated column. View the full page to see article in its original form.

A MAP SHOWING SECTIONS OF THE EAST COAST RAILWAY NOW. COMPLETED. Trains running from Auckland to Taneatua go by way of Frankfcon, Morrinsville, Te Arolia and Paeroa. The dotted line north of Hamilton indicates the proposed route from Pokeno to Paeroa. When finally completed the East Coast Railway is intended to connect • i i with Napier via Gisborne. \ '

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19280328.2.113

Bibliographic details

A MAP SHOWING SECTIONS OF THE EAST COAST RAILWAY NOW. COMPLETED. Trains running from Auckland to Taneatua go by way of Frankfcon, Morrinsville, Te Arolia and Paeroa. The dotted line north of Hamilton indicates the proposed route from Pokeno to Paeroa. When finally completed the East Coast Railway is intended to connect • i i with Napier via Gisborne. \ ', New Zealand Herald, Volume LXV, Issue 19907, 28 March 1928

Word Count
58

A MAP SHOWING SECTIONS OF THE EAST COAST RAILWAY NOW. COMPLETED. Trains running from Auckland to Taneatua go by way of Frankfcon, Morrinsville, Te Arolia and Paeroa. The dotted line north of Hamilton indicates the proposed route from Pokeno to Paeroa. When finally completed the East Coast Railway is intended to connect • i i with Napier via Gisborne. \ ' New Zealand Herald, Volume LXV, Issue 19907, 28 March 1928

Working