THE DREDGE
Work on the local dredge is progressing very satisfactorily. The Wh’angatane Cut is completed, and the spill-way has been opened, thus giving full accees to the flood waters.
A good start has bee* made on the School cut, this is the final undertaking and will probably take three to four months to complete.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NORAG19300820.2.28
Bibliographic details
Northland Age, Volume II, Issue 33, 20 August 1930, Page 6
Word Count
55THE DREDGE Northland Age, Volume II, Issue 33, 20 August 1930, Page 6
Using This Item
NZME is the copyright owner for the Northland Age. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International licence (CC BY-NC-SA 4.0). This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.