RAILWAY PROGRESS.
THE ENGINE AT WAIOTIRA.
Special to "Advocate.")
WAIKIEKIE, Sept. 25,
The Public Works engine arrived at Waiotira station last night with four trucks of goods.
The resident engineer (Mr Wood) confirms this statement and says that the big engine should get through in about one month.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/NA19190925.2.13
Bibliographic details
Northern Advocate, 25 September 1919, Page 2
Word Count
48RAILWAY PROGRESS. Northern Advocate, 25 September 1919, Page 2
Using This Item
NZME is the copyright owner for the Northern Advocate. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons New Zealand BY-NC-SA licence . This newspaper is not available for commercial use without the consent of NZME. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.