ELECTRIC TRAMWAYS.
THE WANGANUI SYSTEM
[PBESS ASSOCIATION.]
, WANGANUI, May 8. Ine contractors for the construction of the electric tramways are pushing on with the erection of the «ar-shed and power-house and preliminary work. The Mayor states • lie aspects the trams to be running by Chnstmas. The rails are expected to arrive in three or four weeks time, and the work of laying will commence as soon after as 'possible.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/MEX19080508.2.53
Bibliographic details
Marlborough Express, Volume XLII, Issue 108, 8 May 1908, Page 8
Word Count
69ELECTRIC TRAMWAYS. Marlborough Express, Volume XLII, Issue 108, 8 May 1908, Page 8
Using This Item
See our copyright guide for information on how you may use this title.