Thank you for correcting the text in this article. Your corrections improve Papers Past searches for everyone. See the latest corrections.

This article contains searchable text which was automatically generated and may contain errors. Join the community and correct any errors you spot to help us improve Papers Past.

Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image
Article image

BIG TUNNEL

UNDER RIVER MEUSE. One of the most important undertakings, now being carried out in Holland, is the construction of a big tunnel under the River Meuse, on which Rotterdam, the most important part of the Netherlands, is situated. When completed, this tunnel, the first of its kind in this country—-will, as to size and capacity, only be surpassed in Europe by the tunnel under the Mersey in Liverpool (says' the “Observer”). The total cost of the tunnel, which will be completed in 1941, will be more than 15,000,000 guilders, including a sum of 12,000,000 guilders- foi'| the tunnel proper. The tunnel will; afford considerable relief to crossriver traffic between the right and left! banks of the Meuse in Rotterdam.! The left bank was, until about 186 S, still quite a rural country, with only one shipbuilding yard, but after 1870 the traffic in the port of Rotterdam began to develop quickly, and since that time the importance of the left bank as an industrial area of the city has gradually increased.

30,000 NEW HOUSES'. In 1878 the Willemsbridge was constructed adjacent to the railway bridge across the Meuse, and developments have far surpassed the highest expectations. At present, about 30 per cent, of the population of Rotterdam lives on the left bank. The recently projected town-plan-ning scheme provides for space for about 30,000 now-dwelling houses, and land for new industries has been reserved.

The tunnel, which contains four tracks for motor traflic and separate tracks for pedestrians and cyclists, will have nine concrete sections protected from water pressure by a coating of welded steel of a thickness of six millimetres.

To obtain extra protection against rust, this steel coating will be covered by a thin layer of concrete. These nine sections will be floated to a position exactly above the proposed course of the tunnel and will then be sunk into a channel across the river, which will have previously been made by dredges. The parts of the tunnel will end on each bank in".special ventilation buildings with huge installations for providing fresh air. On each bank four escalators will be available for the benefit of pedestrians and cyclists.' Both the tracks for motor traffic, | upon emerging from the tunnel be-l yond the ventilation buildings, will be I joined up, after remaining separated for a small distance, by a. partition wall.

Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/GEST19390207.2.22

Bibliographic details

Greymouth Evening Star, 7 February 1939, Page 4

Word Count
393

BIG TUNNEL Greymouth Evening Star, 7 February 1939, Page 4

BIG TUNNEL Greymouth Evening Star, 7 February 1939, Page 4

Help

Log in or create a Papers Past website account

Use your Papers Past website account to correct newspaper text.

By creating and using this account you agree to our terms of use.

Log in with RealMe®

If you’ve used a RealMe login somewhere else, you can use it here too. If you don’t already have a username and password, just click Log in and you can choose to create one.


Log in again to continue your work

Your session has expired.

Log in again with RealMe®


Alert