Article image
Article image
Article image
Article image
Article image
Article image
This article displays in one automatically-generated column. View the full page to see article in its original form.

MINING.

OTAGO A. AND P. SHOW

During the past week the Electric No. 1 dredge worked 154 hours for a distanco ahead of 15ft. The usual width of the cut has been worked, and the bottom still consists of sandstone and granite. Most of thy cat continues to be easily dredged. There was n small rise in the river during the week, Mid this caused the drift to mn into the cut. The river is now receding. The sample of gold it* of a mixed nature.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/ESD19141119.2.56

Bibliographic details

MINING. OTAGO A. AND P. SHOW, Evening Star, Issue 15654, 19 November 1914

Word Count
86

MINING. OTAGO A. AND P. SHOW Evening Star, Issue 15654, 19 November 1914

Working