Article image
Article image
Article image
Article image
Article image
Article image

11. H Wesnvuod Photo.

MAIN HIGHWAY LINK COMPLETED. — The Tangahoe Bridge, jive miles south of Hawera, connecting link on the New Plymouth-Wellington main highway. It has been built to replace a bridge washed away by flood waters eighteen months ago.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19360619.2.50.5

Bibliographic details

Evening Post, Evening Post, Volume CXXI, Issue 144, 19 June 1936

Word Count
40

11. H Wesnvuod Photo. MAIN HIGHWAY LINK COMPLETED. — The Tangahoe Bridge, jive miles south of Hawera, connecting link on the New Plymouth-Wellington main highway. It has been built to replace a bridge washed away by flood waters eighteen months ago. Evening Post, Volume CXXI, Issue 144, 19 June 1936

Working