MINING RETURNS
The following is the official return of Worksop Extended Gold Dredging Co., Ltd.:—Yield, 670z;. hours dredged 133; yards dredged, 9800. With reference to the Golden Sands gold return announced on Saturday, September 28, the secretary states the following particulars:—Approximate value of gold produced, 490z 14dwt at £7 per oz, £347 18s; approximate mining expenditure, £90 2s. The above figures are in connection with the foregoing parcel only, representing a fortnight's sluicing. Waitahu Gold Mining Co., Ltd., reports that a partial wash-up on Friday yielded 730z lOdwt. The previous wash-up was on September 8. Mataki dredge return for the week ended October 6 was 440z, for 117 hours' work.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19351008.2.105.12
Bibliographic details
Evening Post, Volume CXX, Issue 86, 8 October 1935, Page 12
Word Count
110MINING RETURNS Evening Post, Volume CXX, Issue 86, 8 October 1935, Page 12
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.