DELUGE IN SOUTH
COMMUNICATIONS BLOCKED
(By Telegraph.—Press Association.) DUNEDIN, February; 3. As the result of a Cloudburst iii the gorge between Clyde', and Cromwell this afternoon both rail and road communication with upper Central Otago is blocked. The full extent of the damage is not 'known in' Dunedin tonight, but it is understood that five slips of a total length of one mile occurred on the railway line. A work train left tonight for the gorge.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19350204.2.126
Bibliographic details
Evening Post, Issue 29, 4 February 1935, Page 11
Word Count
76DELUGE IN SOUTH Evening Post, Issue 29, 4 February 1935, Page 11
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.