MOTUROA OIL
PROGRESS REPORT
The following report for six weeks ended July 29, 1933, has been received today from Moturoa Oil Fields, Ltd., New Plymouth: —"Work is proceeding satisfactorily with No. 4 well. Cdncrete foundations have been completed, and the work of dismantling, transporting, and re-erecting the derrick and machinery is now in progress.
"Production No. 2 well from June 17 to July 29, 1933, 524 barrels, or 18,340 Imperial gallons. Total production -to date, 401,409 Imperial gallons."
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/EP19330729.2.160
Bibliographic details
Evening Post, Volume CXVI, Issue 25, 29 July 1933, Page 14
Word Count
78MOTUROA OIL Evening Post, Volume CXVI, Issue 25, 29 July 1933, Page 14
Using This Item
Stuff Ltd is the copyright owner for the Evening Post. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.