Article image
Article image
Article image
Article image
This article displays in one automatically-generated column. View the full page to see article in its original form.

"Evening Post" Photo. PREPARATORY WORK AT THE WAINUI TUNNEL.— Looking towards Gracefield and the Hutt-Day's Bay road from the location of the Hutt Valley portal of the new Wainui tunnel, the construction of which will commence shortly. The buildings on the left and- at the foot of the hill are to accommodate the tunnellers during the progress of the work. On the right workmen are constructing the framework of the portal, which is to be 25ft 6in wide and 16ft. high.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/EP19320203.2.25.2

Bibliographic details

"Evening Post" Photo. PREPARATORY WORK AT THE WAINUI TUNNEL.—Looking towards Gracefield and the Hutt-Day's Bay road from the location of the Hutt Valley portal of the new Wainui tunnel, the construction of which will commence shortly. The buildings on the left and- at the foot of the hill are to accommodate the tunnellers during the progress of the work. On the right workmen are constructing the framework of the portal, which is to be 25ft 6in wide and 16ft. high., Evening Post, Volume CXIII, Issue 28, 3 February 1932

Word Count
81

"Evening Post" Photo. PREPARATORY WORK AT THE WAINUI TUNNEL.—Looking towards Gracefield and the Hutt-Day's Bay road from the location of the Hutt Valley portal of the new Wainui tunnel, the construction of which will commence shortly. The buildings on the left and- at the foot of the hill are to accommodate the tunnellers during the progress of the work. On the right workmen are constructing the framework of the portal, which is to be 25ft 6in wide and 16ft. high. Evening Post, Volume CXIII, Issue 28, 3 February 1932

Working