MOUNT MORGAN RETURNS.
The Mount Morgan production report for the four weeks ended January 25, states that ore mined was 72.817 tons, ore treated by sulphide. 37.000 tons, and oxide 33.630 tons. Sulphide mill tailings retreated through the oxide mill amounted to 6.>03 tons. Estimate production of gold wa« 6354 ounces, and copper 277 tons including eight from copper precipitation.
Permanent link to this item
https://paperspast.natlib.govt.nz/newspapers/AS19390128.2.17
Bibliographic details
Auckland Star, Volume LXX, Issue 23, 28 January 1939, Page 5
Word Count
60MOUNT MORGAN RETURNS. Auckland Star, Volume LXX, Issue 23, 28 January 1939, Page 5
Using This Item
Stuff Ltd is the copyright owner for the Auckland Star. You can reproduce in-copyright material from this newspaper for non-commercial use under a Creative Commons BY-NC-SA 3.0 New Zealand licence. This newspaper is not available for commercial use without the consent of Stuff Ltd. For advice on reproduction of out-of-copyright material from this newspaper, please refer to the Copyright guide.
Acknowledgements
This newspaper was digitised in partnership with Auckland Libraries.