Article image
Article image
Article image
Article image
This article displays in one automatically-generated column. View the full page to see article in its original form.

THE WATER SUPPLY.

The borough water supply is gradually nearing the reservoir, and the trust in its ultimate success so firmly held by the majority of the residents is fast drawing towards realisation. There w r ere those who sneered at the scheme, and who still sneer, but the water is within a stone’s throw of the reservoir, and a goodly stream flowing is sufficient answer to those sneers. The deeper holes have been puddled with clay, the water confined to a narrow channel where the gully was wide, and paths cut for the stream where the rises wer.e obstructive. This policy has been successful in bringing the flow down to the point where the gully forks, and passes round what is intended to be left as an island in the midst of the stream. The engineer lias evidently in view filling the reservoir first, and allowing the water to back up afterwards to fill the many little basins that lie at intervals along the windings, of the gully through the domain. At the present rate of progress there is just the possibility of the water being at the reservoir before the borough is ready to receive it.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/AG18800810.2.9

Bibliographic details

THE WATER SUPPLY., Ashburton Guardian, Volume 1, Issue 137, 10 August 1880

Word Count
198

THE WATER SUPPLY. Ashburton Guardian, Volume 1, Issue 137, 10 August 1880

Working