Article image
Article image
Article image
Article image

TUAI POWER STATION

THIRD TURBINE UNIT [by telegraph—own correspondent] GISBORNE, Thursday A third turbine unit for the production of hydro-electric power at Tuai will be installed during the latter part of 1938, according to advico received in Wairoa. Arrangements have been made to take delivery of the machinery about the middle of the year. Tho construction of the pipeline which is to serve this unit is going ahead well. Instead of tlip riveting of the pipes at the joins, as in the case of tho first two lines from tho surge chamber to the power house, tho third line will be welded, diminishing to some extent surface friction opposed to tho flow of water.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/NZH19380211.2.180

Bibliographic details

New Zealand Herald, Volume LXXV, Issue 22960, 11 February 1938, Page 15

Word Count
114

TUAI POWER STATION New Zealand Herald, Volume LXXV, Issue 22960, 11 February 1938, Page 15

TUAI POWER STATION New Zealand Herald, Volume LXXV, Issue 22960, 11 February 1938, Page 15