Article image
Article image
Article image
Article image

RIVER PROTECTION

WAIMAKARIRI HARBOUR BOARD’S WORKS EMBANKMENT NEARLY FINISHED River protection work done by the Waimakariri Harbour Board along the board’s reserves facing Charles street, below the wharf, is nearing completion. To guard against extra high tides the embankment is bein'* raised at the lower end. A footbridge has been built over the drain at Jones street, and an additional bridge has beep constructed in line with the embankment at Beswick street. The straightening of the south bank down from the main bridge to the turning basin is to be begun when the tides are suitable, and when this work is finished to conform with the north bank a great improvement will be effected.

This article text was automatically generated and may include errors. View the full page to see article in its original form.
Permanent link to this item

https://paperspast.natlib.govt.nz/newspapers/CHP19360912.2.157

Bibliographic details

Press, Volume LXXII, Issue 21886, 12 September 1936, Page 20

Word Count
114

RIVER PROTECTION Press, Volume LXXII, Issue 21886, 12 September 1936, Page 20

RIVER PROTECTION Press, Volume LXXII, Issue 21886, 12 September 1936, Page 20